(Above) The base material - A red HB. June 2002.
(Above) The original 1159cc engine is hauled out. July 2002 (Above) Engine bay awaiting V8 installation. August 2002.
(Above) Engine being tried for size, Jan 2003.
(Above) Gearbox crossmember supporting gearbox. April 2003.
(Above) Engine on mounts and N/S manifold being fitted. April 2003.
(Above) Offside exhaust fitting and steering being sorted. April 2003.
(Above) Gearbox in ready for tunnel construction. May 2003.
(Above) Tunnel built. Tunnel is large also to accept the exhaust. November 2003.
(Above) Car as at Nov 2003. Note gasser style front valance.